Tian Xiaobian introduced the five steps that the filter press should pay attention to during installation and commissioning:
1. The filter press should be installed on a flat concrete foundation. The foot of the thrust plate of the feed end is fixed on the foundation by the anchor bolt; the anchor end does not use the anchor bolt, or the anchor bolt locates and is locked by two nuts, and the nut spacer and the socket of the machine are left with proper clearance. The foot can be slightly stretched. Before positioning, the installer should correct the verticality of the beam and the large plane of the thrust plate. The
2, hydraulic filter press, hydraulic station fuel tank into the clean 20 # -40 # hydraulic machinery oil, the use of temperature -5 °C; if the ambient temperature is low, you can use similar viscosity, low condensation point of the hydraulic oil. Hydraulic oil must be added through 80-100 mesh filter.
3. The foundation structure should be designed by the construction engineer according to the load condition of the equipment. The anchor bolt should be provided with two holes for grouting; there should be enough operation and maintenance space around the filter press, and the hydraulic pressure filter press should be selected Place the hydraulic station in an appropriate position to ensure that the hydraulic station is working properly. The
4. Place the filter plate according to the working requirements and arrange the feeding, washing and draining lines. Equipped with a filtered pressure indicator and a reflux channel that controls the pressure of the filter. In the case of diaphragm squeezing, the compressed air line is arranged. The
5, mechanical or hydraulic pressure device, power supply starter motor should work properly. When the hydraulic pressure is applied, the pressure gauge should rise steadily and the hydraulic system should not leak. Correctly adjust the working pressure of the hydraulic station according to the size of the model. If the oil shortage of the fuel tank is found after the test machine, it must be supplemented.